Workplace design

TooSharp Headquarters

The firm had outgrown its office: twice the floor, over fifty-five people, six months. I planned it as a range of places rather than a field of desks, each set by how much focus or company it gives: an open studio along the daylight, glass meeting rooms in view but out of earshot, pods and offices with a door to close, and a breakout as its living room. Deep blue keeps the floor calm; orange marks where people meet. As lead designer I carried every role, from the first drawing to the last fitting.

Industry
Corporate offices
Type
Design & Build
Role
Lead designer
Built, image 1
Built, image 2
Built, image 3
Built, image 4
Built, image 5
Built, image 6
Built, image 7
Built, image 8
Built, image 9
Built, image 10
Built, image 11
Built, image 12
Built, image 13
Built, image 14
Built, image 15
Built, image 16
Built, image 17
Built, image 18
Built, image 19
Built, image 20
Built, image 21
Built, image 22
Built, image 23
Built, image 24
Built, image 25
Built, image 26
Built, image 27
TooSharp Headquarters frame 1
TooSharp Headquarters frame 2
TooSharp Headquarters frame 3
TooSharp Headquarters frame 4
TooSharp Headquarters frame 5
TooSharp Headquarters frame 6
TooSharp Headquarters frame 7
TooSharp Headquarters frame 8
TooSharp Headquarters frame 9
TooSharp Headquarters frame 10
TooSharp Headquarters frame 11
TooSharp Headquarters frame 12
TooSharp Headquarters frame 13
TooSharp Headquarters frame 14

The ceiling

A low gypsum ceiling, about 2.4 m, could carry little, yet it was the design's focal point. The frame spreads the load wide, and a Rhino and Grasshopper script sizes every hole, 5 to 15 mm radius, by its distance to attractor points: a cloud of light, cut into panels easy to make and assemble.

TooSharp Headquarters frame 1
TooSharp Headquarters frame 2
TooSharp Headquarters frame 3
TooSharp Headquarters frame 4
TooSharp Headquarters frame 5
TooSharp Headquarters frame 6
TooSharp Headquarters frame 7
TooSharp Headquarters frame 8

3D printed

One-off pieces don't justify a mould. So much of the detail was 3D printed: the signage, the logos and the orange wall discs, each printed in parts that screw together, then painted, so every shape could be drawn for this office alone.

TooSharp Headquarters frame 1
TooSharp Headquarters frame 2
TooSharp Headquarters frame 3
TooSharp Headquarters frame 4
TooSharp Headquarters frame 5
TooSharp Headquarters frame 6
TooSharp Headquarters frame 7
TooSharp Headquarters frame 8
TooSharp Headquarters frame 9
TooSharp Headquarters frame 10
TooSharp Headquarters frame 11
TooSharp Headquarters frame 12
TooSharp Headquarters frame 13
TooSharp Headquarters frame 14
TooSharp Headquarters frame 15
TooSharp Headquarters frame 16
TooSharp Headquarters frame 17
TooSharp Headquarters frame 18
TooSharp Headquarters frame 19

Drawn for manufacture

Custom pieces only match the render if the workshop can read them. Walls, furniture and light were designed for this floor and drawn for manufacture, then specified for purchase, 32 furniture items with quantities and finishes, and sourced and made, locally and in China.

TooSharp Headquarters frame 1
TooSharp Headquarters frame 2
TooSharp Headquarters frame 3
TooSharp Headquarters frame 4
TooSharp Headquarters frame 5
TooSharp Headquarters frame 6
TooSharp Headquarters frame 7
TooSharp Headquarters frame 8
TooSharp Headquarters frame 9
TooSharp Headquarters frame 10
TooSharp Headquarters frame 11
TooSharp Headquarters frame 12
TooSharp Headquarters frame 13
TooSharp Headquarters frame 14
TooSharp Headquarters frame 15
TooSharp Headquarters frame 16
TooSharp Headquarters frame 17
TooSharp Headquarters frame 18
TooSharp Headquarters frame 19
TooSharp Headquarters frame 20
TooSharp Headquarters frame 21
TooSharp Headquarters frame 22
TooSharp Headquarters frame 23
TooSharp Headquarters frame 24
TooSharp Headquarters frame 25
TooSharp Headquarters frame 26
TooSharp Headquarters frame 27
TooSharp Headquarters frame 28
TooSharp Headquarters frame 29
TooSharp Headquarters frame 30

The design

Every room was settled in render first, and the build was held to it. Rendered in D5 and 3ds Max.

Closing thoughts

Holding every role meant every question came back to me, from the ceiling's hangers to the manufacturers in China. What I'm proudest of is that we brought the renders to the ground as closely as we could, through continuous hardship and a lot of headache.

Services
Interior designConstruction drawingsSite supervisionContractingProcurementFurniture and product designPhotography
Tools
RhinoGrasshopper3ds MaxCoronaV-RayD5 RenderAdobe Creative Cloud
Date
2026